Case Studies

We provided

First

Hong Kong Environmental Protection Department

Multistorey Public Car Park Hong Kong CBD

Charging ports: 124, spread across 6 floors
Configuration: 32A Single-Phase, maximum output 7kW

CHALLENGE

In 2020, the Hong Kong  Environmental Protection Department (EPD) engaged I-Charge on a major project to provide multiple EV charging facilities at one of its largest public car parks. After a number of discussions with the EPD leadership group, it was clear this was going to be a significant undertaking. The six-storey car park is not only one of the busiest in Hong Kong, but it is also located in one of the highest density blocks of the CBD. 

Tags :

example, category, and, terms

Give Us A Call

(+021) 645 863 232

Send Us A Message

support@domain.com

Office Location

Jl. Sunset Road No.815

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore

News Letter

Lorem ipsum dolor sit amet, consectetur adipisci elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua

Accounting Firm Themes by Jegstudio

Copyright © 2022. All rights reserved.